01Building Information Modelling
University Campus 4D Sequencing
4D construction sequencing in Synchro for a six-building university campus, linking the federated model to the contractor's programme.
- BIM
- Education & Civic
- North America
- 2024



- Client
- North American contractor
- Location
- North America
- Year
- 2024
- Sector
- Education & Civic
- Service
- Building Information Modelling
- Scope
- 6 buildings
- Output
- 4D · Synchro
02The Project
From the client's data to a deliverable their team builds on.
- 01
The brief
4D construction sequencing in Synchro for a six-building university campus, linking the federated model to the contractor's programme.
03Project Views
Inside the project
01 Registered point cloud supplied by the client, coloured by intensity.
02 Wireframe check of the model against the point cloud.
03 Elevation geometry traced from the scan.
04 Section of the scan used for façade setting-out.
05 Presentation view for the client team.
06 Finished model, materials applied.
04More Projects
Related work
2023Healthcare & Life Sciences
Hospital Campus MEPF BIM
For a UK healthcare trust
- Scope
- 280 beds
- LOD
- LOD 400
2024Commercial & Mixed-Use
Mixed-Use Tower Federation
For a UAE developer
- Scope
- 68 floors
- LOD
- LOD 400
2024Transport & Aviation
Rail Corridor As-Built Modelling
For a European rail operator
- Scope
- 32 km · 110 stations
- LOD
- LOD 350
05Start a Free Pilot Project
Get a Free Pilot Project.
Point Cloud to BIM/CAD, BIM Modelling, Geospatial Deliverables, CAD Drafting, or CGI Visualisation.
Send us your scan data, drawings, or project brief. We'll deliver a sample BIM model, geospatial output, CAD drawing, or photorealistic CGI render as a 10-hour pilot — at no cost, no commitment, no obligation. Just proof that our BIM, CAD, and visualisation process delivers.
- Zero Risk
- Zero Commitment
- 10-Hour Pilot Scope
- NDA & ISO 27001 Protected
Your pilot runs the same process as your fiftieth project. ISO 9001 certified. NDA-protected. Zero hidden costs.